Step 1: At the Command Center, under ‘All’, select ‘Material Haulage’.
Step 2: Under ‘Material Haulage’, select ‘Haulage Reports’.
Step 3: Adjust the filters provided and enter in the date range. Once entered, click ‘Create Report’.
Step 4: Once created, a chart showing the total number of spreads/dumps along with the amount of material will appear below. Each Material Haulage keypad unit will be represented by a specific colour on the chart.
Each dump/spread recorded in the applied date range will be plotted on a map below the chart. Selecting a dump/spread will bring up additional information such as date/time, type of material, amount of material and cost of material applied.
A brief summary report below the map will show the totals for the applied date range.
Step 5: Additional detailed reports showing total spreads by unit and material appear below. These reports can be downloaded as an Excel or .csv file at any time by clicking at the top right corner of the report.
5/20/2026