FIX-IT: Mark Sections Requiring Work or Repair

FIX-IT - Designating Sections Requiring Work or Repair

FIX-IT – Designating Sections Requiring Work or Repair

Using the X-IT device, field-users will be able to create geographic sections designated as “Needs Work”. Each marked section (i.e. project) will appear in a report, showing what area(s) requires reparation. Supervisors can customize each project to include details and a timeline of completion, as well as the ability to designate a project as ‘completed’. Operators can be provided access via email to viewable (non-editable) specific task and project location information for the work to be performed.

Assigning Button on X-IT Device to Mark Areas Requiring Repair

Step 1: A) At the Command Center, select your X-IT device from the drop-down list.

B) Once selected, click on ‘Settings’.

Step 2: In the Settings, select the tab titled ‘Device’.

Step 3: A) Click on the drop-down list for Button 1 and select ‘Geo-Fix’ to mark a fixed area for repair. Once selected, find & select the appropriate type of repair required from the list below.

Example: If button 1 is assigned as a Geo-Fix for ‘Culvert Repair’, pressing button 1 will mark the location as an area that requires culvert repair.

Continue to assign the remaining three buttons (if necessary) with the type of repair you plan to mark.

B) Upon completing your button assignments, click ‘Save’ at the bottom to assign.

Notes
NOTE:
  • Any area marked as a Geo-Fix will appear as a square with a default size of 35 x 35 meters.
  • 15 repair types are available to choose from at the time of setup. Additional repair types can be created by going to History>XIT Fix>Settings.

Using X-IT to Mark Projects

When approaching an area that you wish to mark as a project, stop the vehicle at the center point of the project location. Once you have come to a complete stop, press the appropriate button to plot the section for the project. Buzzer will go off to indicate that the section has been marked. Repeat the process for each subsequent project.

Viewing Projects in Report & Map

Step 1: At the Command Center, under ‘All’, select History>XIT Fix.

Step 2: Select Reports and apply the appropriate date range in the fields provided. Additional fields for Project Type & Division can be applied to customize your report. Once everything has been entered in, select ‘Create Report’.

Step 3: Upon creation, a map of all marked projects created in the provided date range will appear below as an alphanumerical pin (project type: A-Z & number) that includes the entire section (as indicated by the coloured pin) of that project.

Sections in ‘Orange’ indicate projects that are ‘Not Completed’, while sections in ‘Green’ indicate projects that have been completed. The map can be filtered to view:

  • Not completed (orange only)
  • Completed (green only)
  • All (green & orange. Default view)

Step 4: Selecting a project pin on the map will bring up the following:

  • Project Number
  • Project Name (if applicable)
  • Division (if applicable)
  • Status (completed/not completed)
  • Creation Date
  • Completion Date (if applicable)
  • Memo (added details for project)
Notes
NOTE: Divisions cannot be created using your Administrator account. If you wish to have divisions, you will need to provide ConX a digital copy of your mapped divisions for us to implement.

Step 5: Below your map, you will find two reports; Project Summary Report & Project Detail Report. The summary report will show the number of projects not completed vs. number of projects completed in the date range.

The detailed report provides a list of each project, including the following information:

  • Project Number
  • Project Name
  • Project Type
  • Division
  • Date of Creation
  • Date of Completion
  • Estimated Start of Project
  • Estimated End of Project
  • Memo (details of project)

To mark a project as ‘Completed’ and/or to add details, select ‘Edit’ for the desired project.

Step 6: A pop-up window for the selected project will appear. To mark a project as completed, select ‘Completed’ under Type. Additional information such as the project name, estimated start/end and memo can also be added.

Once you have marked the project as completed, click ‘Save’.

Step 7: A pop-up window will appear upon saving, confirming your project changes. Click OK to proceed.

The project will now show as completed on your map, as indicated by the green pin and section.

Selecting this project pin will bring up the recently edited changes, including the date of completion.

Notes
NOTE:
  • Projects can be edited at any time.
  • Project reports can be printed as a .pdf or exported as an Excel and .csv file.
  • The project report outlined in this document is only accessible by Text2Car/ConX Wireless manager accounts (i.e. Supervisors, Foreman, CAO). Field operators can be provided access to viewable specific task and project location information for work to be performed by email. See step 8 on how to do this.

Step 8: Field operators can be provided access to view a specific task and project location information for work to be performed by email. To provide this, select ‘Email Link’, enter in the operator’s email and click ‘OK’.

The operator will receive an email containing a link to access a map of all projects requiring completion.

You can also provide a link to the public showing all of the upcoming projects to be completed by selecting ‘Email Link’. This link can be embedded on to your website and will allow any visitor to your webpage the ability to view upcoming projects.

5/20/2026